The Platform

A Multi-Revenue Infrastructure Platform

OTEC systems are not single-output assets. They are integrated infrastructure platforms designed to generate multiple contracted revenue streams:

01

Baseload Power

PPA
02

Desalinated Water

Water-as-a-Service
03

Cooling

SWAC potential
04

Hydrogen / Future fuels

This model enhances project economics while reducing cost to the primary offtaker.

Rationale

Why OTEC. Why Now.

Defense Alignment

Aligned with U.S. Defense Priorities

OTE Corp’s platform supports:

Installation energy resilience

Fuel independence

Water security

Mission continuity

The company is actively engaged with defense stakeholders and infrastructure partners to advance deployment under long-term contractual structures.

Flagship Development

Flagship Development: U.S. Army – Kwajalein Atoll

Site
U.S. Army Garrison – Kwajalein Atoll (USAG-KA)
Programme
U.S. Army–led engineering and analysis
Status
Engineering and financial modeling underway
Next step
Long-term Power Purchase Agreement discussions

OTE Corp is currently engaged under a U.S. Army-led engineering and analysis program to evaluate deployment of an OTEC system at U.S. Army Garrison – Kwajalein Atoll (USAG-KA).

The project is designed to

Engineering and financial modeling underway in preparation for long-term Power Purchase Agreement (PPA) discussions.

Dual Offtake

Dual-Offtake Model: Powering Kwajalein and Ebeye

OTE Corp is advancing a strategic extension of the Kwajalein project to serve Ebeye Island, one of the most infrastructure-constrained communities in the Pacific.

Defense offtake

U.S. Army Garrison – Kwajalein

Civilian offtake

Ebeye Island

This dual-offtake structure

The OTEC system under consideration for U.S. Army Garrison, Kwajalein could serve both defense resilience and civilian infrastructure needs.